DSA Studio
Search
Home
Sign in
System Design Foundations Checkpoint
Requirements, estimation, and latency budgets.
1. Which requirement most directly constrains architecture?
Latency SLO (P99)
UI color scheme
Team size
Brand name
2. What does P99 latency mean?
3. Back-of-the-envelope estimation is primarily for:
Order-of-magnitude reasoning
Exact capacity planning
Code optimization
UI layout
4. If your latency budget is blown, the most correct action is:
Redesign the critical path
Add more logging
Ignore and hope
Reduce availability target
5. In a read-heavy system, the critical path is primarily the ____ path.
6. Which trade-off often improves latency but risks staleness?
Caching
Synchronous replication
Strict serialization
Encryption at rest
Submit quiz
Auto-advance on pass